Confirm the brief
We distinguish a new-build certificate, existing-building assessment and any separate advisory or compliance question. This avoids commissioning the wrong output.
Non-domestic energy certification
Establish the certification route for a non-domestic building and prepare the survey, evidence and lodgement scope.
A commercial EPC records an asset rating based on a standardised assessment. The survey or as-built model still depends on accurate geometry, fabric and building-services information.
We first confirm the building type, trigger for certification and information available. New construction may build on an as-built Part L model. Existing buildings generally require an inspection and evidence review. Complex properties, mixed uses, incomplete services information or multiple tenancies may need additional preparation before an assessment can be completed. Lodgement is undertaken only within the appropriate accredited process.
We distinguish a new-build certificate, existing-building assessment and any separate advisory or compliance question. This avoids commissioning the wrong output.
Drawings, O&M information, equipment data, previous reports and access to the relevant spaces reduce reliance on conservative defaults.
Mixed-use areas, landlord and tenant systems, extensions and phased occupation can affect scope. We identify these issues before survey or modelling.
Confirm the unit being certified and access to its fixed services. Mixed uses, landlord systems and separate tenancies can change the scope; a previous certificate should not be assumed to describe the current building.
The appropriate non-domestic energy assessment for the agreed building and purpose.
Certificate and associated documentation where the assessment is complete and lodgement is included.
Key information used and material limitations encountered during the assessment.
Getting started
Address, use, floor area, age, occupancy status and reason the certificate is required.
Plans, sections, specifications, previous EPC or BRUKL reports and services documentation where available.
Safe access to relevant internal spaces and plant, with a knowledgeable contact where an existing-building survey is required.
No. They are related in some new-build workflows, but a BRUKL compliance report and an EPC serve different purposes.
Sometimes, but more surveying and conservative assumptions may be required. We confirm feasibility from the property details.
Requirements and exemptions depend on the circumstances. Obtain legal or property advice if you are unsure about the trigger.
No. The government's June 2026 interim response proposes a targeted future rule for private rented non-domestic buildings over 1,000 m² in England and Wales, where cost-effective, and secondary legislation is still required.
Building size, location, assessment level, zoning, fixed-services complexity, drawing and evidence quality, site access and the purpose or deadline all affect the scope. We confirm the required survey, evidence and lodgement before quoting.
Use the edition, jurisdiction and assessment route that apply to the project. Publication of newer guidance does not automatically change an existing project’s requirements.
Send the property use, location, size, reason for assessment and any existing drawings or reports.