Technical guidance

Knowledge for the next project decision

Practical guidance on energy, overheating, certificates and construction evidence.

Find the question that matches your project. Each guide keeps its source and review date visible.

12 articles

EPC evidence

EPC evidence: EASOB scheme requirements

How EASOB scheme requirements relate to new-home and commercial EPC records, Part L photographs and assessment quality checks.

Construction and completion

Air-tightness testing: site readiness before the test

A practical guide for site teams preparing a new dwelling for air-permeability testing, with the drawings, details and records that need to stay aligned.

Homes and extensions

Part G water efficiency: check the fixture schedule before it is fixed

A practical guide to coordinating sanitaryware, flow rates, appliance data and the water-efficiency calculation for a new dwelling in England.

Construction and completion

Sound insulation testing: plan the test before completion

A practical starting point for projects that may need sound-insulation testing, covering scope, programme, room condition and the evidence the team should retain.

Commercial property

Commercial EPC assessment levels: Level 3, 4 or 5?

Commercial EPC assessment levels reflect building and services complexity, not a simple size or use-class shortcut.

Homes and extensions

When does an extension need a SAP calculation?

Extensions in England can require a project-specific energy calculation where glazing or other design choices go beyond a straightforward elemental route.

Regulation updates

Future Homes Standard, SAP 10.3 and HEM: the position in July 2026

The 2026 Approved Document L has been published, its main effective dates are in 2027, SAP 10.3 is the initial methodology and the Home Energy Model will follow later.

Regulation updates

Non-domestic MEES and EPC B in 2031: what is proposed?

The June 2026 interim response proposes a targeted EPC B standard for larger private rented non-domestic buildings, but legislation is still required.

Construction and completion

Part L photographs that remain useful at completion

New-dwelling Part L evidence in England needs identifiable, plot-specific photographs taken at the right construction stage and checked against the assessed design.

Energy and overheating

SAP, SBEM and dynamic simulation: which model answers which question?

SAP assesses dwellings, SBEM covers many non-domestic compliance cases, and dynamic simulation can answer more detailed time-based performance questions.

Commercial property

Who needs an EPC? A practical England and Wales guide

An EPC is commonly needed when a building is constructed, sold or let, but exemptions, building use and the type of assessment all matter.

Read guidance in the context of the building’s location, approval route and applicable methodology. Dated policy updates record the position at their stated review date; check the official source before relying on a future requirement.

Ask about the actual project

Send the location, stage, drawings and the approval or design question you need to resolve.

Discuss a project