Choose a coherent system
Natural, intermittent, continuous mechanical and heat-recovery strategies have different design and installation needs. Mixing assumptions from different systems creates gaps.
Ventilation performance
Ventilation calculations and design coordination, with installation and commissioning evidence planned alongside SAP and overheating work.
Ventilation needs to provide adequate air quality in the building that will actually be constructed. System choice, duct routes, terminals, controls, acoustics and commissioning all influence the outcome.
We review the dwelling, proposed ventilation system and applicable guidance, then calculate or check the required rates within the commissioned scope. Coordination with Part L and Part O matters: fan power, heat recovery, infiltration assumptions, purge ventilation and window operation can appear across several assessments. Installation design and commissioning must remain with appropriately competent project parties.
Natural, intermittent, continuous mechanical and heat-recovery strategies have different design and installation needs. Mixing assumptions from different systems creates gaps.
Duct size, length, bends, insulation, terminals, access and noise should be resolved in the design. A nominal fan selection cannot compensate for an impractical route.
Installed systems need the relevant inspection, testing, commissioning and handover information. We identify required inputs for related energy calculations.
A fan’s stated capacity does not establish the installed system performance. Duct routes, terminals, controls and commissioning information need to support the rates and system assumed by the assessments.
The agreed Part F ventilation output with required rates and assumptions.
Issues affecting energy, overheating, noise or installation feasibility.
Relevant commissioning and handover items needed from the responsible installer or project team.
Getting started
Plans, room schedule, floor areas, wet-room locations, airtightness strategy and occupancy assumptions required by the method.
System type, fan or unit data, duct layouts, terminals, controls and relevant acoustic information.
SAP assumptions, Part O strategy and commissioning programme where these interact with the ventilation design.
No. We provide the commissioned assessment and coordination support. Installation and commissioning remain with the appropriate project parties.
They address different functions, but inconsistent or unrealistic operation should be resolved. We coordinate the relevant inputs where both are commissioned.
Final energy inputs must reflect the installed system and required evidence. We confirm the project-specific information needed.
Use the edition, jurisdiction and assessment route that apply to the project. Publication of newer guidance does not automatically change an existing project’s requirements.
Send the dwelling plans, system proposal and the stage at which you need design or completion support.